← Product
Production Hub Building now

The floor, in step with the order.

Model your real stations once — pick, decorate, QC, pack, ship — then let scanpoints move work through them. Every unit is accounted for, and the order upstream updates itself.

Get in touch See it working ↓
1

The floor board

Where the shift starts. Counters per station, jobs sorted by what's due, and batches grouped so the same setup runs together instead of five times over.

Leeds floor
Tuesday shift · 12 jobs open
Rows Stations
Pick
3
Decorate
5
QC
2
Pack
1
Held
1
JobWhat it isStationBatchDue
JOB-40817 40 × cap · embroidered names Decorate Thread A Today
JOB-40818 24 × tee · 3 front designs Decorate DTG-2 Thu
JOB-40815 60 × mug · photo wrap QC — Thu
JOB-40812 12 × tote · 1 unit held Held — Overdue
Select jobs to move them together Print jobsheets Advance station
Bulk actions tell you the truth. Advance 10 jobs and you get “8 moved, 2 skipped — artwork not ready”, naming the two. Nothing moves halfway.
2

Paper on the bench, scan at the station

The jobsheet carries everything the operator needs and a barcode that identifies the unit. Scanning is the whole interaction — no hunting for the right row on a screen.

JOB-40817
Unit 12 of 40 · WV-4820 ·002
▌▍▐▌▎▐▌▍▐▎▌
40817·012
Product
6-Panel Cap · Navy
Aspect
Front panel
Method
Embroidery
Thread
Sky 2145
Personalisation
MARCUS
Centred · 90 × 50 mm area · 24 mm cap height
marcus-front.dst
Stitch file · 4,120 stitches
Ready
Scanpoint · Decorate
Station open
Scan the jobsheet
or key the unit number
JOB-40817 · unit 12
“MARCUS” · Sky 2145
Info · locate Advance to QC
Weavery validates the move before accepting it: wrong station, missing artwork or a failed QC gate is refused at the scan, with the reason on screen.
37 advanced today2 held for artwork
3

When one comes out wrong

A failed unit is scrapped and replaced, not quietly re-run. The replacement inherits the personalisation and keeps a link to what it replaced, so the count on the order never drifts.

QC · unit 12
Spelling matches the order
Placement within tolerance
Stitch density — puckering on the V
Scrap & replace Pass anyway
Unit lineage
Unit ·012 scrapped at QC
Stitch density · operator R. Odeh · 14:22
Unit ·041 created as replacement
Inherits “MARCUS” · Sky 2145 · 14:22
Order still owes 40 units
Blank consumption now 41 — the shrinkage is visible
4

Pack, buy the label, done

Dispatch confirms the box contents against the order, prices the services you've enabled, and buys the label. Tracking lands back on the order without anyone copying a number.

Parcel · WV-4820
40 × cap · embroidered40/40
10 × tote · screen print10/10
Weight6.4 kg
Box450 × 350 × 250 mm
Live rates
Tracked 48
Arrives Thu 18 Sep
£7.85
Next day, pre-noon
Arrives Wed 17 Sep
£14.20
Economy 3–5 day
Arrives Mon 22 Sep
£5.40
Buy label · £7.85
On purchase: order moves to Completed, tracking posts back to the storefront, and the customer's shipping email goes out.

Tell us how your floor runs

Stations, batching, QC habits, the lot. We're building this alongside the people doing the work.

Get in touch See the Order Hub →